• Subdivisions – Commercial/Residential/Rural
• Right of Way Surveys – Pipeline/Utility
• Road Surveys – Highways/Municipal
• Natural Resources, Oil, Gas and Energy
• Industrial/Residential Project Development
• Topographic Surveys
• Engineering Surveys
• Pipeline Integrity and Management
- Piles/Foundations/Anchor Bolts
- Piping/Mechanical
- Civil/Earth Works/Roads/Bridges
- Preliminary/As-built Surveys
- Structural Steel/Equipment Setting
Moose Jaw, SK • 72 High St. E. • S6H 0B8
1-844-645-5835 • www.millteksurveys.ca
After the addition of new partners and
other key staff members, the original and
new management teams brought their ef-forts,
experience and knowledge together,
which resulted in a period of rapid growth.
The size of the company doubled over a pe-riod
of two years.
Even though they did not have a partic-ular
target in mind, they were passionate
about their work and there was a high mar-ket
demand for construction services. In
response to the rapid growth and to meet
the demands of the Saskatchewan market-place,
they founded additional companies.
First in 2012, Integrated Engineering
Inc. was created to provide engineering
services. Then in 2015, they added Acadia
MEMBER PROFILE
Nipawin Water Treatment
Plant underground piping
A culture of continual
improvement is
the glue that holds
the diverse team
of close to 200
employees together.
46 Think BIG | Quarter 2 2017 | saskheavy.ca
/www.millteksurveys.ca
/saskheavy.ca